RT2 Frame |
Finally getting started on the RT2 frame |
Rear motor mount ready to braze |
Brazed but not cleaned up |
Glass bead blasting cleans off the flux better than hot water
|
Top 2 cross tubes in place |
Next 2 ready to tack |
first 4 brazed in place |
Next 4 brazed with not much clearance to the head. I need to find a center plug MX head as the enduro head has 2 plugs that will foul the frame. |
4 more tacked in place
|
Head tube brazed and the design has also changed a bit from the original drawing |
Front motor mount hangers. I made the frame this way so I can work on the top end without removing motor. |
Rear section finished. Just need to make seat and tank mounts. |
Finished frame with seat and tank mounts |
Front Motor mount. This is how I need to make the front mount on my MT125 frame. |
|
Finished swing arm with Delrin bushings |
Chain adjusters |
Triple clamps |
Footpeg mounts |