| RT2 Frame | 
|  | 
| Finally getting started on the RT2 frame | 
|  Rear motor mount ready to braze | 
              Brazed but not cleaned up | 
|  Glass bead blasting cleans off the flux better than hot water 
 |  Top 2 cross tubes in place | 
|  Next 2 ready to tack |  first 4 brazed in place | 
|  Next 4 brazed with not much clearance to the head. I need to find a center plug MX head as the enduro head has 2 plugs that will foul the frame. |  4 more tacked in place 
 | 
|  Head tube brazed and the design has also changed a bit from the original drawing |  Front motor mount hangers. I made the frame this way so I can work on the top end without removing motor. | 
|  Rear section finished. Just need to make seat and tank mounts. |  Finished frame with seat and tank mounts | 
|  Front Motor mount. This is how I need to make the front mount on my MT125 frame. |  | 
| Finished swing arm with Delrin bushings | 
|  Chain adjusters | Triple clamps | 
| Footpeg mounts |  |